PROJECTS

Our work speaks for itself



01.

Reconstruction of soda regenerated boiler (90 t/h, 42 atm, 440°C)

under “ANDRITZ’s” design in “Svilocel” JSC



02.

Hot water boiler KVDB-2MW with fuel wood briquettes and hot water temperature 105°C

of the "Dimitar Pavlovich" Hospital in the town of Svishtov


03.

Design, manufacturing, installation and start-up of boiler IK-15-45/280 item B-810

in company workshop “Propylene” of “Lukoil Neftohim Burgas” JSC



04.

Manufacturing a heat exchanger for “Lukoil Neftohim Burgas” JSC



05.

Design, manufacturing, installation and start-up of boiler-utilizer to furnace 900F-1

in “Lukoil Neftohim Burgas” JSC


06.

Design, manufacturing, installation and start-up of heat waste recovery plant

of four boilers type KM-12 in “Toplofikacia Yambol” JSC



07.

Manufacturing, installation and start-up of air preheater with heat pipes to four boilers type PK 38-4 (240 t/h, 130 atm, 545°C)

in “TEC Maritza East 2” JSC


08.

Manufacturing of heating surfaces

under project of STEIN ENRGIE C.I. – France for object Balcas – Scotland


09.

Manufacturing of coil pipes for CPP and SHPP for boiler type ПК 38-4 (240 t / hour, 130 atm, 545°C)

in “TPP Maritsa East 2 ” EAD


10.

Manufacturing of coil pipes for repairing of the steam boiler (1,6 t/h, 13 atm, 194°C)



11.

Manufacturing of isometric tubes of steam pypelines for turbine room 2 x 380 MW

under ALSTOM’s project for AES - “TEC Maritza East 1”



12.

Design, construction, start-up and setup of auxiliary steam station 24 t/h

in “Enel Maritza East 3” JSC


13.

Design, construction, start-up and setup of steam station 36 t/h

in “Bulgarian Sugar Plant” JSC


14.

Design, construction, start-up and setup of steam station 6,5 t/h in “Ekoplast” JSC.

Gasification over 600 sites in the industrial and communal sectors on the territory of the country.


15.

Design of gasification and automation of tunnel furnace, mounting, start-up and setup

in “Badeshte-Butovo” AJSC


16.

Reconstruction of site gas pipe-line system, GMS and GDI and gasification of furnaces N: 4 and N: 5

In “Titan Zlatna Panega Cement” JSC


17.

Design, construction, start-up and setup of cogeneration

In University Hospital “Prof. Dr. St. Kirkovich” AD - Stara Zagora


18.

GDMB - 600 nm3/h; 200 / 0,1 bar



19.

Design, construction, start-up and setup of wood pellets boiler

in "Ivan Skenderov" hospital - Gotse Delchev


20.

Erection of straw boiler SURI 15x16 BIO in Kalafat, Romania

“Roquette” SA plant


21.

Design, manufactoring, erection, start-up and setup of new ECO of soda regenerated boiler

in “Mondi Stambolyiski” EAD, the syti of Stamboliyski


22.

Design, delivery and construction of straw fired boiler plant with output 18 tonnes

of steam per hour in “Vin. S. Industries” Ltd, Tzerkovski


23.

Gasification of technological furnace

in “Centromet” JSC, Vratza